GENERAL PROJECT INFORMATION
Project Name::
Tesla - San Antonio, TX - E. Basse
Scope of Work:
Tesla is proposing to install an commercial electric vehicle charging station within the existing parking lot of the shopping plaza. The project includes (12) charging posts, (3) charging cabinets, (1) switchgear assembly, (1) utility transformer and (1) utility meter. The cabinets, utility transformer and switchgear are proposed to be installed within a trex fence enclosure.
Type of Review Requested::
Standard
What is the type of Project?:
Commercial
What is the total acreage for the project?:
3000
Has there been a Preliminary Plan Review meeting?:
No
Have you applied for a Code Modification Request (CMR)?:
No
Is the owner an ISD or Alamo Colleges District that is part of the Interlocal Agreement?:
No
Is this a project under the TDLR TAS review and the valuation $50,000 or more?:
Yes
What is the TDLR Architectural Barriers Registration Number?:
2023006707
Is this is a City Project?:
No
Is the project Affordable Housing through deed, SAHA or a community development corporation?:
No
Is a building being demolished as part of this project?:
No
Are there any known Historic buildings or structures on site being affected?:
No
Do you have Non-Conforming Rights for the building or use?:
No
IssuanceEmail:
Yes
SPECIFIC BUSINESS USES DETAILS
Is the use of the building or space changing from the previous use?:
No
SITEWORK DETAILS
What is the Valuation of the Sitework portion of this project? (Material and labor):
160000.00
Will the work include electrical utility work?:
Yes
Will a TML be required with this permit?:
No
Will a TOPS be required with this permit?:
No
Will the work include underground water utility work?:
No
Will the work include sewer utility work?:
No
Will the work include irrigation work?:
No
Is the intent to construct a building with a Occupancy Classification of Storage (S-1 or S-2)?:
No
Is the intent to construct a building with an Occupancy Classification of Residential (R-1 or R-2)?:
No
What is the total square footage of the future building?:
3000
TREE PROTECTION DETAILS
How will the construction work affect any heritage, significant or historic trees?:
A2
Was there a tree variance approved?:
No
STORM WATER FLOOD DETAILS
Provide the increase or decrease in impervious cover (all concrete, asphalt and roof areas)::
40
Is this property part of the mandatory detention area?:
No
Is the site part of a development agreement?:
No
Is this property in the floodplain?:
No
Was a FILO paid with a plat?:
No
Is this project located in the Low Impact Development (LID) mandatory area?:
No
Does the submitted Construction Set include Low Impact Development (LID) components?:
No
GENERAL SITE DETAILS
Is grading/work in a CPS Energy transmission easement affecting a CPS Energy pole/tower/structure?:
No
Is irrigation for landscaping proposed?:
No
Does your project involve the use of construction equipment such as cranes affecting air space?:
No
Will there be a generator utilizing a fuel storage tank?:
No
Will the site utilize reclaimed water?:
No
Will you utilize a septic tank/system?:
No
Will a sidewalk/street/lane be closed requiring a ROW closure permit?:
No
Will a temporary covered pedestrian walkway be built?:
No
Is there an existing Traffic Impact Analysis (report) for this project?:
No
Will there be a new Traffic Impact Analysis (report) for this project?:
No
Is the project within an Edwards Aquifer Authority (EAA) Subchapter 713 Regulated Zone?:
No
Is there active, abandoned, or plugged water well on the property?:
No
Is there an existing paved parking lot for this site?:
No
Is there a new parking lot or additional parking proposed for this project?:
No
SIDEWALKS AND CURBS DETAILS
Are curbs, sidewalks, handicapped ramps, driveway approaches in a ROW being replaced/constructed?:
No
WAIVER ELIGIBILITY
Is your project approved for a City fee waiver program?:
No
ACKNOWLEDGEMENT
Acknowledgement 1:
Yes
Acknowledgement 2:
Yes