GENERAL PROJECT INFORMATION
Project Name::
108RHAPHUT
Is this project going to be phased?:
No
Building Foundation:
Yes
Building Shell:
Yes
Minor Building Structures:
Yes
Type of Review Requested::
Standard
What is the type of Project?:
Commercial
What is the total acreage for the project?:
0.003
Has there been a Preliminary Plan Review meeting?:
No
Have you applied for a Code Modification Request (CMR)?:
No
Is the owner an ISD or Alamo Colleges District that is part of the Interlocal Agreement?:
No
Is this a project under the TDLR TAS review and the valuation $50,000 or more?:
No
Is this is a City Project?:
No
Is the project Affordable Housing through deed, SAHA or a community development corporation?:
No
Is a building being demolished as part of this project?:
No
Are there any known Historic buildings or structures on site being affected?:
No
Do you have Non-Conforming Rights for the building or use?:
No
SPECIFIC BUSINESS USES DETAILS
Will a Health - Boarding Mobile inspection be required?:
No
Will a Health - Environmental inspection be required?:
No
Will a Health - Air Pollution inspection be required?:
No
Will a Health inspection and Food Establishment Permit be required?:
No
Is the use of the building or space changing from the previous use?:
No
SITEWORK DETAILS
What is the Valuation of the Sitework portion of this project? (Material and labor):
0.00
Will the work include electrical utility work?:
Yes
Will a TML be required with this permit?:
No
Will a TOPS be required with this permit?:
Yes
Will the work include underground water utility work?:
No
Will the work include sewer utility work?:
No
Will the work include irrigation work?:
No
Is the intent to construct a building with a Occupancy Classification of Storage (S-1 or S-2)?:
No
Is the intent to construct a building with an Occupancy Classification of Residential (R-1 or R-2)?:
No
What is the total square footage of the future building?:
360
TREE PROTECTION DETAILS
How will the construction work affect any heritage, significant or historic trees?:
A1
Was there a tree variance approved?:
No
STORM WATER FLOOD DETAILS
Provide the increase or decrease in impervious cover (all concrete, asphalt and roof areas)::
450
Is this property part of the mandatory detention area?:
No
Type of Detention:
None
Is detention provided offsite?:
No
Is FILO acceptable for this development?:
No
Is the site part of a development agreement?:
No
Is this property in the floodplain?:
No
Was a FILO paid with a plat?:
No
Is this project located in the Low Impact Development (LID) mandatory area?:
No
Does the submitted Construction Set include Low Impact Development (LID) components?:
No
GENERAL SITE DETAILS
Is grading/work in a CPS Energy transmission easement affecting a CPS Energy pole/tower/structure?:
No
Is irrigation for landscaping proposed?:
No
Does your project involve the use of construction equipment such as cranes affecting air space?:
No
Will there be a generator utilizing a fuel storage tank?:
No
Will the site utilize reclaimed water?:
No
Will you utilize a septic tank/system?:
No
Will a sidewalk/street/lane be closed requiring a ROW closure permit?:
No
Will a temporary covered pedestrian walkway be built?:
No
Is there an existing Traffic Impact Analysis (report) for this project?:
No
Will there be a new Traffic Impact Analysis (report) for this project?:
No
Is the project within an Edwards Aquifer Authority (EAA) Subchapter 713 Regulated Zone?:
No
Is there active, abandoned, or plugged water well on the property?:
No
Is there an existing paved parking lot for this site?:
No
Is there a new parking lot or additional parking proposed for this project?:
No
SIDEWALKS AND CURBS DETAILS
Are curbs, sidewalks, handicapped ramps, driveway approaches in a ROW being replaced/constructed?:
Yes
What is the total linear feet of new curb?:
0
What is the total square footage of new sidewalk?:
0
What is the square footage of new driveway approaches (normally within 20-feet from the curb line)?:
160
How many handicapped ramps are being reconstructed or newly constructed in the right of way?:
0
MULTIPLE BUILDING DETAILS
Are multiple buildings being proposed as part of this Project scope of work?:
No
Number of foundations, buildings or tenant spaces, or school portables that require a COO or LOC?:
1
SPECIFIC BUILDING INFORMATION
Is this building for temporary use with no permanent Certificate of Occupancy?:
No
Are you using Height/Area increase with Fire Sprinklers where not required for other reasons?:
No
Are you using the Perimeter/Frontage Increase?:
No
Is this an Unlimited Area Building?:
No
Will the new or remodeled building/space contain over 500 sq. ft. of high piled combustible storage?:
No
Will the new or remodeled building/space store or utilize hazardous materials defined in the IFC?:
No
Is this a warehouse, manufacturing, repair or maintenance shop, laboratory or hospital use?:
No
ENERGY CONSERVATION
If this is a new building, addition, or interior finish out, indicate the energy software used?:
Not Applicable
Which Code year of the IECC or ASHRAE 90.1 was the energy system design under?:
N/A
If this is a new building, addition, or interior finish out, indicate the compliance path used::
Not Applicable
If a new shell or building, indicate the air barrier design method used::
Not Applicable
MINOR BUILDING STRUCTURES TYPE
Pad Sites:
Yes
Does the scope of work include electrical, mechanical or plumbing?:
Yes
What is the total valuation of the Pad Site(s) (material and labor)?:
3000.00
WAIVER ELIGIBILITY
Is your project approved for a City fee waiver program?:
No
ACKNOWLEDGEMENT
Acknowledgement 1:
Yes
Acknowledgement 2:
Yes